SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912P725BA008 | ZONE 7 FLOOD CONTROL CHANNELS PHASE 1 (10 SITES) PL 84-99 PROJECT | |
Synopsis | ||
The amendment modifies the solicitation to these changes represent one of three types, either adding new information, deleting information, or revising existing information. Changes made by this amendment replace the previously issued sections of the advertisement, as referenced in the below summary of changes: Site visit sign in sheet. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912P725BA008 | ZONE 7 FLOOD CONTROL CHANNELS PHASE 1 (10 SITES) PL 84-99 PROJECT | |
Synopsis | ||
THE ZONE 7 FLOOD CONTROL CHANNELS PHASE 1 (10 SITES) PL 84- 99 PROJECT IS AN ONE TIME REPAIR PROPOSED BY USACE TO REPAIR STORM DAMAGED TO FLOOD CONTROL CHANNELS IN ALAMEDA COUNTY. DAMAGES CONSISTED OF EROSION AND BANK FAILURES DURING A SERIES OF ATMOSPHERIC RIVERS BETWEEN DECEMBER 2022 AND MARCH 2023. REPAIRS CONSIST OF TEN (10) SITES ALONG ARROYO MOCHO AND ALAMO CANAL, INCLUDING G-6, G-7, G-8, G-9, G-10, G-13, G-14, F-11, F-12, AND F-13.THE EXISTING FLOOD CONTROL CHANNELS TYPICALLY HAVE EARTHEN SLOPES PREVIOUSLY CONSTRUCTED TO GRADES OF 2H:1V, WITH CHANNEL HEIGHTS RANGING FROM 15-30 FEET. THE DAMAGED SITES .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |