SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912P725BA008 | ZONE 7 FLOOD CONTROL CHANNELS PHASE 1 (10 SITES) PL 84-99 PROJECT | |
Synopsis | ||
THE ZONE 7 FLOOD CONTROL CHANNELS PHASE 1 (10 SITES) PL 84- 99 PROJECT IS AN ONE TIME REPAIR PROPOSED BY USACE TO REPAIR STORM DAMAGED TO FLOOD CONTROL CHANNELS IN ALAMEDA COUNTY. DAMAGES CONSISTED OF EROSION AND BANK FAILURES DURING A SERIES OF ATMOSPHERIC RIVERS BETWEEN DECEMBER 2022 AND MARCH 2023. REPAIRS CONSIST OF TEN (10) SITES ALONG ARROYO MOCHO AND ALAMO CANAL, INCLUDING G-6, G-7, G-8, G-9, G-10, G-13, G-14, F-11, F-12, AND F-13.THE EXISTING FLOOD CONTROL CHANNELS TYPICALLY HAVE EARTHEN SLOPES PREVIOUSLY CONSTRUCTED TO GRADES OF 2H:1V, WITH CHANNEL HEIGHTS RANGING FROM 15-30 FEET. THE DAMAGED SITES .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |