ZDV CTRB Raised Floor

Posted Date: Dec 01, 2025
Jan 28, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
6973GH-26-R-00024 ZDV CTRB Raised Floor
Synopsis

The overall scope of this project is to provide a new 18” high raised access floor system (+/- 2,982 SF) and SRG in the
Control Wing Basement at ZDV. (2) new ADA compliant ramps and stairs will be provided to access the new raised access
floor. A new 9’-6” partition will be constructed to enclose the new raised access floor system. The existing nonconforming
east door will be removed, and a new door will be provided within a new 2-hour rated alcove.


The contractor shall provide all necessary labor, materials, and equipment to complete the following work. Also review
the attached drawings and specifications.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
FEDERAL AVIATION ADMINISTRATION Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙