Z--Hyrum Dam Spillway Replacement

Posted Date: Nov 11, 2024
Due Date: Nov 28, 2024
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
140R4024R0020 Z--Hyrum Dam Spillway Replacement
Synopsis
The work associated with the Hyrum Dam Spillway Replacement Project will take place approximately 9 miles southwest of Logan, Utah in Cache County, Utah. The overall work is for the construction of a new spillway and the removal of the existing spillway. This includes, but isn't limited to: removal and control of water, construction of a new reinforced concrete spillway, riprap outlet channel, riprap inlet area, associated mechanical and electrical features, associated drainage systems, associated foundation aggregate piers, roadway bridge, gate hoist structure and equipment, radial gates, embankment dike, new inverted siphons for irrigation canals, administrative access road and drainage, roadway realignment, and excavation and removal of the existing spillway structure. The anticipated performance period is March 2025 through January 2029. .... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF RECLAMATION Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
140R4024R0020 Z--Hyrum Dam Spillway Replacement
Synopsis
The work associated with the Hyrum Dam Spillway Replacement Project will take place approximately 9 miles southwest of Logan, Utah in Cache County, Utah. The overall work is for the construction of a new spillway and the removal of the existing spillway. This includes, but isn't limited to: removal and control of water, construction of a new reinforced concrete spillway, riprap outlet channel, riprap inlet area, associated mechanical and electrical features, associated drainage systems, associated foundation aggregate piers, roadway bridge, gate hoist structure and equipment, radial gates, embankment dike, new inverted siphons for irrigation canals, administrative access road and drainage, roadway realignment, and excavation and removal of the existing spillway structure. The anticipated performance period is March 2025 through January 2029. .... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF RECLAMATION Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
140R4024R0020 Hyrum Dam Spillway Replacement
Synopsis
Hyrum Dam Spillway Replacement .... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF RECLAMATION Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
140R4024R0020 Z--Pre-Sol Notice Hyrum Dam Spillway Replacement
Synopsis
Z--Pre-Sol Notice Hyrum Dam Spillway Replacement .... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF RECLAMATION Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙