Z--Folsom Dam Warehouse Bridge Crane Replacement

Posted Date: Jul 16, 2026
Aug 31, 2026
Awarded Date: No Awarded Date
SetAside Type
SDVOSB Sole Source
Solicitation ID Solicitation Title Solicitation Office
140R2026R0017 Z--Folsom Dam Warehouse Bridge Crane Replacement
Synopsis
The purpose of this requirement is to design, build, furnish and install one 30 ton bridge crane to replace the existing bridge crane in the Folsom Dam Warehouse. .... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF RECLAMATION Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙