Z--Bridge 447 - Timber Replacement

Posted Date: Dec 09, 2025
May 01, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
140P6426B0001 Z--Bridge 447 - Timber Replacement
Synopsis
PRE-SOLICITATION NOTICE:

The National Park Service, Interior Regions 3/4/5, Ohio Major Acquisition Buying Office, intends to issue a Invitation for Bids (IFB) for the Bridge 447 – Timber Replacement project for the Cuyahoga Valley National Park in Brecksville, OH.

Work will consist of providing all labor, materials, tools and other equipment necessary to install all new Bridge Timbers on Bridge 447. Approximate length of bridge is 207 feet long. All timbers will be matched to the correct tie and location on the Bridge. Install 14 approach ties on each end of bridge. Standard 7”x9”x8-’6” track ties. Install approximately 420 feet .... Read More
Office Location Agency Name Solicitation Base Posting Type
NATIONAL PARK SERVICE Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙