Y1NZ--Design-Build (DB) Connect Reclaim Water at Lake Baldwin Campus

Posted Date: Mar 23, 2026
Mar 25, 2026
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
36C24826R0057 Y1NZ--Design-Build (DB) Connect Reclaim Water at Lake Baldwin Campus
Synopsis
The purpose of this amendment is to extend the due date and time of proposals. See attachment for RFIs. .... Read More
Office Location Agency Name Solicitation Base Posting Type
VETERANS AFFAIRS, DEPARTMENT OF Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
36C24826R0057 Y1NZ--Design-Build (DB) Connect Reclaim Water at Lake Baldwin Campus
Synopsis
See Attachments for information related to Amendment 1 of Phase One RFIs. .... Read More
Office Location Agency Name Solicitation Base Posting Type
VETERANS AFFAIRS, DEPARTMENT OF Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
36C24826R0057 Y1NZ--Design-Build (DB) Connect Reclaim Water at Lake Baldwin Campus
Synopsis

Refer to the attachments for additional details.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
VETERANS AFFAIRS, DEPARTMENT OF Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙