| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 36C24826R0057 | Y1NZ--Design-Build (DB) Connect Reclaim Water at Lake Baldwin Campus | |
| Synopsis | ||
|
The purpose of this amendment is to extend the due date and time of proposals. See attachment for RFIs.
.... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| VETERANS AFFAIRS, DEPARTMENT OF | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 36C24826R0057 | Y1NZ--Design-Build (DB) Connect Reclaim Water at Lake Baldwin Campus | |
| Synopsis | ||
|
See Attachments for information related to Amendment 1 of Phase One RFIs.
.... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| VETERANS AFFAIRS, DEPARTMENT OF | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 36C24826R0057 | Y1NZ--Design-Build (DB) Connect Reclaim Water at Lake Baldwin Campus | |
| Synopsis | ||
|
Refer to the attachments for additional details. .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| VETERANS AFFAIRS, DEPARTMENT OF | Combined Synopsis/Solicitation | |