Y--Yellowtail Switchyard DCS Ph I Pre-Fab Bldg/Const

Posted Date: Jun 30, 2025
Jun 30, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
89503225BWA000069 Y--Yellowtail Switchyard DCS Ph I Pre-Fab Bldg/Const
Synopsis
Yellowtail Switchyard DCS Phase I priniciple components of work include demolishing of existing building, providing a new pre-fabricated building, complying with all applicable safety requirements contained in WAPA's Construction Standard 1 and OSHA Standards, replacing five (5) 230-kV power circuit breakers including their concrete foundations, rotating six (6) 115-kV power circuit breakers 180 degrees, replacing four (4) 115-kV power circuit breaker concrete foundations, removing six (6) pothead steel structures, removing two (2) disconnect switches (steel only), removing eighteen (18) bus poles and their foundations, removing two (2) lighting units and their foundations, removing two (2) disconnect switches and their foundations, .... Read More
Office Location Agency Name Solicitation Base Posting Type
ENERGY, DEPARTMENT OF Combined Synopsis/Solicitation