Y--LAKE - TWO COMMUNICATIONS TOWER INSTALLATION AND ONE TOWER EXTENSION AT HILL TO

Posted Date: Apr 06, 2026
May 27, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
140P8126B0003 Y--LAKE - TWO COMMUNICATIONS TOWER INSTALLATION AND ONE TOWER EXTENSION AT HILL TO
Synopsis
The National Park Service, ConOps West, has a requirement for the installation of two Self Supporting Communications Towers and the modification of one existing tower within Lake Mead National Recreation Area to increase the functionality of the parks Land Mobile Radio System. The work consists, in general, of furnishing all labor, materials, equipment, tools, transportation, and incidentals required to install the two self-support towers with concrete foundations (one at Boulder Beach Ranger Station and one at the Willow Beach Saddle Communications Site) as well as the 10ft tower extension modification at the Hill Top Tower. For the Hill Top .... Read More
Office Location Agency Name Solicitation Base Posting Type
NATIONAL PARK SERVICE Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙