Y--GAOA-HENRY MOUNTAINS FIELD STATION, UT

Posted Date: Jun 30, 2025
Jul 15, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
140L0625B0010 Y--GAOA-HENRY MOUNTAINS FIELD STATION, UT
Synopsis
The Bureau of Land Management (BLM) has a construction requirement which consists of all labor, materials, equipment, permits, and supervision to demolish and replace the Henry Mountains Field Station. The upgrades including, but not limited to, the following:
a. Constructs a new field station and warehouse building.
b. Incorporate new pavilions.
c. Move the public toilet so that parking can be more accommodating.
d. Replace all existing asphalt in site road and parking area around the field station.
e. Construct open area in place of old building that is being taken down.
f. 80% of landscaping to be native plants for xeriscaping.
g. Replace north fence with a privacy fence.
h. Install new retention facility to contain runoff.
i. Replace existing culinary water main.
.... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF LAND MANAGEMENT Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙