Y--Cottonwood Substation Construction, Stage 02, Phase 01

Posted Date: May 12, 2026
Jun 29, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
89503326BWA000019 Y--Cottonwood Substation Construction, Stage 02, Phase 01
Synopsis
Cottonwood Substation Construction, Stage 02, Phase 01

Western Area Power Administration, Sierra Nevada Region has a requirement for a contractor to provide all labor, materials, equipment, transportation and other resources to complete the construction of Cottonwood Substation, Stage 02, Phase 01 located in Shasta County, CA.

The principal components of work include one (1) pre-fabricated control building foundation, site development for yard access, removal of existing wall to accommodate one (1) automatic 20-foot rolling gate, gate accessibility equipment including one (1) environmental enclosure and associated control cables, two (2) keypads and one (1) gate motor operator, station service arrangement and associated .... Read More
Office Location Agency Name Solicitation Base Posting Type
ENERGY, DEPARTMENT OF Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙