Y--2026 MARCOTT COULEE PIPELINE

Posted Date: Jul 20, 2026
Aug 04, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
140L3626R0002 Y--2026 MARCOTT COULEE PIPELINE
Synopsis
MARCOTT COULEE PIPELINE

The Department of Interior, Bureau of Land Management (BLM), Montana State Office intends to solicit proposals for constructing and installing a complete stock-water delivery system known as the Marcott Coulee Pipeline Project. Work includes trenching to a minimum 6-foot bury depth, HDPE pipeline installation, excavation, embankment construction, temporary excavation support, water system assembly installation, watering assemblies, water trough assemblies, curb stop valve assemblies, remote tap assemblies, air-relief valve assemblies, bedding and backfill placement, gravel placement, wood post installation, erosion-control practices, and all associated testing required to verify system performance. All work must comply with detailed federal specifications, ASTM .... Read More
Office Location Agency Name Solicitation Base Posting Type
BUREAU OF LAND MANAGEMENT Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙