Water Well Drilling Project at California Hotel

Posted Date: Mar 16, 2026
Mar 30, 2026
Awarded Date: No Awarded Date
SetAside Type
No Set aside used
Solicitation ID Solicitation Title Solicitation Office
19BY7026Q0002 Water Well Drilling Project at California Hotel
Synopsis

This solicitation is amended to extend offer due date until March 30, 2026 9.00 a.m Bujumbura Time. All other terms and condtions remain unchanged

.... Read More
Office Location Agency Name Solicitation Base Posting Type
STATE, DEPARTMENT OF Presolicitation
SetAside Type
No Set aside used
Solicitation ID Solicitation Title Solicitation Office
19BY7026Q0002 Water Well Drilling Project at California Hotel
Synopsis

The US Embassy in Bujumbura, Burundi, has requirements for drilling a new well to include purchasing and installing the well pump and connecting the well to the bulk water supply fill station that will be located at Embassy 02 Compound outside perimeter wall.
The objective is to have a fully functioning water well that will supply water to the rest of Embassy residential areas using water distribution truck, the truck must be able to connect easily to bulk supply filling station. In accordance with the terms and conditions set forth below, the Contractor will furnish all supervision, labor, management, facilities, supplies, equipment and material, and all required services necessary for the performance of the work. The Contractor will provide the required services to the U.S. Government as described in the requirements of the Statement Of work.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
STATE, DEPARTMENT OF Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙