SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W50S8525BA006 | VGLZ199555 Repair Fire Station Foundation Bldg. 859 | |
Synopsis | ||
The floor slab in the northern part of the building has been settling since the completion of construction in 2001 and continues to settle. These settlements have caused cracks to develop in the floor slabs, as well as in the non-load-bearing masonry wall, resulting in numerous problems as follows: uneven and out of level floors; trip hazards at doorways due to differential settlement up to one inch between doorways and the floor slabs; cracks in the non-load-bearing masonry walls and lintels at the doorways, causing misaligned door frames; horizontal and vertical cracks in the non-load-bearing masonry walls; vertical cracks in .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Presolicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W50S8525BA006 | VGLZ199555 Repair Fire Station Foundation Bldg. 859 | |
Synopsis | ||
The floor slab in the northern part of the building has been settling since the completion of construction in 2001 and continues to settle. These settlements have caused cracks to develop in the floor slabs, as well as in the non-load-bearing masonry wall, resulting in numerous problems as follows: uneven and out of level floors; trip hazards at doorways due to differential settlement up to one inch between doorways and the floor slabs; cracks in the non-load-bearing masonry walls and lintels at the doorways, causing misaligned door frames; horizontal and vertical cracks in the non-load-bearing masonry walls; vertical cracks in .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Presolicitation |