5 August 2025 Cont. Two additional documents have been added that did not transfer from the PIEE solicitation module. These should have been included during the 3:35pm update. 5 AUGUST 2025 3:35pm UPDATE - AMENDMENT 0002 This update changes the bid due date to Friday August 8th 2025 at 0900 EDT. This update also includes updated RFIs from August 8th submissions. Please see RFI document attached. 29 JULY 2025 UPDATE - AMENDMENT 0001 incorporates the recent Wage Determination update, adds in RFIs, and changes to the drawing package. OFFERORS MUST ACKNOWLEDGE AMENDMENTS WITH BID PACKAGE. The floor slab in .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W50S8525BA006 | VGLZ199555 Repair Fire Station Foundation Bldg. 859 | |
Synopsis | ||
The floor slab in the northern part of the building has been settling since the completion of construction in 2001 and continues to settle. These settlements have caused cracks to develop in the floor slabs, as well as in the non-load-bearing masonry wall, resulting in numerous problems as follows: uneven and out of level floors; trip hazards at doorways due to differential settlement up to one inch between doorways and the floor slabs; cracks in the non-load-bearing masonry walls and lintels at the doorways, causing misaligned door frames; horizontal and vertical cracks in the non-load-bearing masonry walls; vertical cracks in .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Presolicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W50S8525BA006 | VGLZ199555 Repair Fire Station Foundation Bldg. 859 | |
Synopsis | ||
The floor slab in the northern part of the building has been settling since the completion of construction in 2001 and continues to settle. These settlements have caused cracks to develop in the floor slabs, as well as in the non-load-bearing masonry wall, resulting in numerous problems as follows: uneven and out of level floors; trip hazards at doorways due to differential settlement up to one inch between doorways and the floor slabs; cracks in the non-load-bearing masonry walls and lintels at the doorways, causing misaligned door frames; horizontal and vertical cracks in the non-load-bearing masonry walls; vertical cracks in .... Read More
|
||