| SetAside Type | ||
| Small Business Set Aside - Total | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 70Z08526Q0026058 | USCGC Stratton Shaft Alignment and Bearing Reaction Check | |
| Synopsis | ||
|
Statement of Work CGC Stratton Shaft Alignment and Bearing Reaction Check Intent: contractor must measure and report to USCG the Vertical and Horizontal Loads on the (2) bull gear bearings and (2) intermediate bearings, stern and strut bearings, using the Strain Gage Method. Period of Performance: 01 November 2026 – 01 January 2027 Location: USCGC Stratton, 42 Eagle Road Coast Guard Island, Alameda CA 94501 Contractor will install a total of (5) full bridge strain gage sets on the Port shaft, and (5) strain gage sets on the Starboard shaft, to complete the bearing .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| US COAST GUARD | Combined Synopsis/Solicitation | |