USCGC Sewage and Gray Water Systems - Clean and Inspect, Diesel and Boiler Exhaust Cleaning

Posted Date: Jan 13, 2025
Jan 24, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
70Z02925QNEWO0110 USCGC Sewage and Gray Water Systems - Clean and Inspect, Diesel and Boiler Exhaust Cleaning
Synopsis

This requirement is for the Contractor to clean the CGC WEDGE's Main Diesel Engine (MDE) exhaust piping system, including the associated stack uptakes, port and starboard Ship Service Diesel Generators (SSDGs) exhaust piping systems, including associated stack uptakes, Boiler Exhaust stack uptakes, Barge Diesel Engine exhaust piping, and to clean and flush the sewage piping system, clean and flush the Gray/Grey Water Piping systems, and clean and inspect the sewage holding tanks in accordance with the Statement of Work (SOW, attached) and provided SFLC Standard Specifications and Drawings. The Statement of Work references some drawings that will not be utilized. All relevant .... Read More

Office Location Agency Name Solicitation Base Posting Type
US COAST GUARD Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙