USCGC Bertholf Turbine CPU and Install

Posted Date: Feb 10, 2026
Feb 12, 2026
Awarded Date: No Awarded Date
SetAside Type
Partial Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
70Z08526Q0003430 USCGC Bertholf Turbine CPU and Install
Synopsis

 

THIS HAS BEEN AWARD VIA JOTFOC THIS IS FOR INFORMATIONAL PURPOSES ONLY.

TECHNICAL SERVICES TO REPAIR WOODWARD MicroNet NT CPU (PN 5466-409)

Background.  CGC BERTHOLF is usable to start the Main Gas Turbine.  While steaming at HP7 on the GT, a Micronet System Faulty (PV131047) alarm appeared on MCS-5 as well as a Hardware Chassis A Fan Fault on the GT Woodward panel. GT operation was not hindered. After securing the GT,  MCMS alarmed with a GT Engine Control System (ECS) hardware fault prohibiting water wash from being completed. SF .... Read More

Office Location Agency Name Solicitation Base Posting Type
US COAST GUARD Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙