USCG Station Eaton's Neck Boiler Combustion Analysis and calibration

Posted Date: Nov 02, 2026
Nov 13, 2026
Awarded Date: No Awarded Date
SetAside Type
Small Business Set Aside - Total
Solicitation ID Solicitation Title Solicitation Office
70Z02427QBOST001 USCG Station Eaton's Neck Boiler Combustion Analysis and calibration
Synopsis
THE TIMELINE FOR VISIT WILL BE 11/3/26-11/6/2026, 11/9/2026-11/10/2026 8AM- 3PM EST. SITE VISITS: MUST BE COORDINATED WITH DC1 MICHAEL BUSH VIA PHONE 934-235-0487. This project consists of combustion analysis, calibration, and commissioning services for eleven (11) boilers at the U.S. Coast Guard housing area at Station Eaton?s Neck.(12 Lighthouse Rd, Northport, NY 11768) Each housing unit contains the following equipment covered under this agreement: Boiler: Weil-McLain EVG 299 (280,000 BTU) Hot Water Storage Tank: Weil-McLain AQUA PLUS ? 55 ? S2 The purpose of this requirement is to verify and adjust boiler combustion settings in accordance with applicable manufacturer specifications; support safe, efficient, and reliable boiler operation; and document any equipment conditions requiring work beyond the scope of combustion calibration and commissioning. .... Read More
Office Location Agency Name Solicitation Base Posting Type
US COAST GUARD Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙