USCG KETCHIKAN ELECTRICAL WORK

Posted Date: Feb 26, 2026
Mar 13, 2026
Awarded Date: No Awarded Date
SetAside Type
No Set aside used
Solicitation ID Solicitation Title Solicitation Office
PierOneBaseKetchikan USCG KETCHIKAN ELECTRICAL WORK
Synopsis

EXTENDED PROPOSAL DUE DATE OUT TO 13 MARCH 2026 AT 3:00 PM ALASKA TIME

SEE ATTACHED SPECS/SCOPE OF WORK---- 

Scope of Work: Electrical Inspection and Maintenance – Floating Pier One, Base Ketchikan

1. Objective:
Provide inspection, maintenance, and repair services for electrical systems associated with Floating Pier One, Base Ketchikan, with a focus on shore tie terminals and associated electrical lines.

2. Location:
Floating Pier One, Base Ketchikan. Berth 5

3. Tasks:

A. Shore Tie Terminal Maintenance

  • Inspect all shore tie terminals where vessels connect to shore power.
  • .... Read More
Office Location Agency Name Solicitation Base Posting Type
US COAST GUARD Combined Synopsis/Solicitation
SetAside Type
No Set aside used
Solicitation ID Solicitation Title Solicitation Office
PierOneBaseKetchikan USCG KETCHIKAN ELECTRICAL WORK
Synopsis

SEE ATTACHED SPECS/SCOPE OF WORK---- 

Scope of Work: Electrical Inspection and Maintenance – Floating Pier One, Base Ketchikan

1. Objective:
Provide inspection, maintenance, and repair services for electrical systems associated with Floating Pier One, Base Ketchikan, with a focus on shore tie terminals and associated electrical lines.

2. Location:
Floating Pier One, Base Ketchikan. Berth 5

3. Tasks:

A. Shore Tie Terminal Maintenance

  • Inspect all shore tie terminals where vessels connect to shore power.
  • Identify and document any damage, corrosion, moisture intrusion, or other deficiencies.
  • Repair any identified .... Read More
Office Location Agency Name Solicitation Base Posting Type
US COAST GUARD Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙