| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W9123826BA012 | USACE SPK Construction - Natomas PP5, Sacramento, CA | |
| Synopsis | ||
|
***Abstract of Offers has been posted, see attachments*** *** Amendment 0004 has been issued ****** Amendment 0003 has been issued****** Amendment 0002 has been issued****** Amendment 0001 has been issued ***The United States Army Corps of Engineers (USACE) Sacramento District (SPK) is issuing a solicitation for the requirement to construct a new pumping plant facility in Sacramento, CA. The American River Common Features, Natomas Basin Project was authorized by the Water Resources Reform Development Act of 2014. The Natomas Basin is divided into nine reaches, A through I. Pumping Plant 5 (PP5) is in Reach B, located along the Sacramento .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W9123826BA012 | USACE SPK Construction - Natomas PP5, Sacramento, CA | |
| Synopsis | ||
|
USACE SPK Construction - Natomas PP5, Sacramento, CA .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| No Set aside used | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W9123826BA012 | USACE SPK DBB Construction - Natomas PP5, Sacramento, CA | |
| Synopsis | ||
|
The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement to construct a new pumping plant facility in Sacramento, CA. The American River Common Features, Natomas Basin Project was authorized by the Water Resources Reform Development Act of 2014. The Natomas Basin is divided into nine reaches, A through I. RD-1000’s Pumping Plant 5 (PP5) is in Reach B, located along the Sacramento River near the landside toe of the levee and south of Interstate 5. PP5 is designed to discharge drainage from the West Drainage Canal to the Sacramento River following any significant .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Presolicitation | |