USACE SPK Construction - Natomas PP5, Sacramento, CA

Posted Date: Sep 10, 2026
Sep 29, 2026
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W9123826BA012 USACE SPK Construction - Natomas PP5, Sacramento, CA
Synopsis
USACE SPK Construction - Natomas PP5, Sacramento, CA .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
SetAside Type
No Set aside used
Solicitation ID Solicitation Title Solicitation Office
W9123826BA012 USACE SPK DBB Construction - Natomas PP5, Sacramento, CA
Synopsis

The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement to construct a new pumping plant facility in Sacramento, CA.

The American River Common Features, Natomas Basin Project was authorized by the Water Resources Reform Development Act of 2014. The Natomas Basin is divided into nine reaches, A through I. RD-1000’s Pumping Plant 5 (PP5) is in Reach B, located along the Sacramento River near the landside toe of the levee and south of Interstate 5. PP5 is designed to discharge drainage from the West Drainage Canal to the Sacramento River following any significant .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙