UPS battery backup

Posted Date: Feb 17, 2026
Mar 09, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
12639526Q0042 UPS battery backup
Synopsis

Work includes adding a UPS system to a server.  Installation includes a 25kW UPS unit on one of the current 60-amp circuits for the main server rack.  Equipment includes a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal, and Galaxy VS Maintenance Bypass cabinet, UL, Single-unit 10-40kW 208V, 20-80kW 480V, or equal.  Also required is an Emergency Power Off button.

Solicitation and attachment are posted below.

Photos of room and equipment posted below.

RFI: Would you be able to tell me what the battery runtime requirement is for this opportunity?  Response: Less than 5 min, main purpose is to run between power outage and when the generator will kick on, which should be less than 30 secs.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
ANIMAL AND PLANT HEALTH INSPECTION SERVICE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙