| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 6982AF25B000022 | TX FLAP UV CR203(1) Fish Hatchery Road | |
| Synopsis | ||
|
TX FLAP UV CR203(1) Fish Hatchery Road The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while FDR embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required. .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 6982AF25B000022 | TX FLAP UV CR203(1) Fish Hatchery Road | |
| Synopsis | ||
|
TX FLAP UV CR203(1) Fish Hatchery Road .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| FEDERAL HIGHWAY ADMINISTRATION | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 6982AF25B000022 | TX FLAP UV CR203(1) Fish Hatchery Road | |
| Synopsis | ||
|
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NUMBER: TX FLAP UV CR203(1) PROJECT NAME: Fish Hatchery Road PROJECT DESCRIPTION: Widening and reconstruction of 0.71 miles of CR203 (Fish Hatchery Road) for access to the US Fish and Wildlife Service (USFWS) Uvalde National Fish Hatchery, in Uvalde, Texas, beginning at the intersection of US 90 and ending at the Fish Hatchery gate. The project terrain is level. There are no optional schedules or optional project termini. SCOPE OF THE WORK: The project will widen and .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| FEDERAL HIGHWAY ADMINISTRATION | Presolicitation | |