Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project

Posted Date: Oct 20, 2026
Oct 21, 2026
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W912DS26RA032 Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Synopsis
As of 20 October 2026: Amendment 0004 posted to revise the response to RFI#18. As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W912DS26RA032 Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Synopsis
As of 19 October 2026: Amendment 0003 posted to extend the due date from 19 October 2026 to 21 Ocotber 2026. As of 13 October 2026: Amendment 0002 posted to respond to contractor RFIs. RFIs are no longer being accepted. As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents. As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation. As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W912DS26RA032 Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Synopsis

As of 02 October 2026: Amendment 0001 posted along with Phase one and Phase Two DB Selection Procedure documents.

As of 18 September 2026: RTA 30% Package broken up and uploaded due to SAM size limitation.

As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase 1) as well as flood risk management components (Phase II). The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W912DS26RA032 Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Synopsis
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙