Turbo HiPace 80 Neo DN63 C

Posted Date: Aug 11, 2025
Aug 20, 2025
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
401791 Turbo HiPace 80 Neo DN63 C
Synopsis

Turbo HiPace 80 Neo DN63 C

The Fusion Energy Division at Oak Ridge National Laboratory requires a Turbo HiPace 80 Neo DN63 C, Power failure venting valve, MPT 200 PB, Connection cable, RS 485,  Mains cable, 115V AC, (USA/J),  HiScroll 12 Comfort Bundle, and Mains cable, 115V AC (USA/J). Refer to Attachment C for specifications.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
ENERGY, DEPARTMENT OF Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙