| SetAside Type | ||
| Small Business Set Aside - Total | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| FA9101T9PU | Tunnel 9 Pitch Upgrade | |
| Synopsis | ||
|
The Arnold Engineering Development Complex (AEDC) Tunnel 9, located in Silver Spring, MD, requires the comprehensive modernization of a high-performance hydraulic motion system. The scope of this Firm Fixed-Price (FFP) requirement includes the design, engineering, procurement, off-site fabrication, pre assembly, on-site demolition, installation, and commissioning of core system components. All components must comply with ASME B31.1, ASME BPVC VIII, and ISO 4406 standards. Core components include: ? Primary control valve (step response time of 55 ms or less) ? Main actuating cylinder (working stroke of 120.5? capable of achieving a linear speed of 13 ft/s) ? Hydraulic Power Unit (HPU) ? Dedicated filtration and cooling "kidney" loop. .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE AIR FORCE | Combined Synopsis/Solicitation | |