TROLLEY MODIFICATION

Posted Date: Jul 21, 2025
Aug 14, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
W911PT-25-Q-0064 TROLLEY MODIFICATION
Synopsis

TROLLEY MODIFICATION AT B419
FFP

TO COVER ALL LABOR, MATERIAL, AND EQUIPMENT TO REPLACE
TROLLY ON CRANE B419. REPLACE EXISTING 30/10 TON TROLLEY
AND HOISTS WITH NEW 20 TON TROLLEY PER PERFORMANCE WORK
STATEMENT PR84678660.


Service Contract Labor Standards 15-4143 Latest Revision applies and is
incorporated.


Contracting Officer's Representative (COR) is Alex Gardner


FOB: Destination
NSN: AASSVC324301AD

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W911PT-25-Q-0064 CRANE TROLLEY MODIFICATION
Synopsis

B419 CRANE TROLLEY REPLACEMENT in the manufacturing area of WVA.

-  This procurement is for the labor, equipment, and material required for replacement of trolley on crane – replace existing 30/10 ton trolley and hoists on crane B419 with new 20 ton trolley in the chrome high bay area of WVA.

*** THIS IS A PRESOLICITATION NOTICE ONLY ***

In order to be eligible for award, the successful offeror's System for Award Management (SAM) Registration must be active and include representations and certifications. This solicitation will be issued electronically, therefore hardcopies will not be provided. Upon release .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙