| SetAside Type | ||
| No Set aside used | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 19JM3727Q0002 | Trenching, Conduit and Ground-well Installation | |
| Synopsis | ||
|
Description The United Stated Embassy in Kingston is requesting proposals for Trenching, Conduit And Ground-Well Installation in various locations on the Embassy compound. The contractor will provide all labor, equipment, supervision, material specific to the back filling and compaction and management needed to complete the job Infrastructure Support System - Handhole / Underground Conduit System Trenching Nine locations have been identified requiring trench work. Thirteen locations have been identified requiring trench work. Before excavation, the Contractor shall locate and verify all existing utilities in the proposed trench alignment. If excavation interferes with existing drains, piping, or structures, the Contractor shall .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| STATE, DEPARTMENT OF | Combined Synopsis/Solicitation | |