Tonto Culvert Order (Amended)

Posted Date: Sep 22, 2026
Sep 22, 2026
Awarded Date: No Awarded Date
SetAside Type
No Set aside used
Solicitation ID Solicitation Title Solicitation Office
12444126Q0060 Tonto Culvert Order (Amended)
Synopsis

This project covers the replacement and replenishment of corrugated metal culvert pipes required to support road maintenance operations across the Tonto National Forest. The Contractor shall manufacture, supply, and deliver corrugated metal pipes (CMP) and all associated hardware, including coupling bands, in full compliance with FP-24 specifications (and FP-14 where applicable). All materials must meet requirements for dimensions, coatings, joints, and markings. Deliveries will be intended for stock-on-hand, allowing the Forest Service to rapidly deploy these materials for installation or replacement of drainage infrastructure on Forest System roads. This capability is critical for maintaining roadway drainage capacity and resilience, particularly .... Read More

Office Location Agency Name Solicitation Base Posting Type
FOREST SERVICE Combined Synopsis/Solicitation
SetAside Type
No Set aside used
Solicitation ID Solicitation Title Solicitation Office
12444126Q0060 Tonto Culvert Order
Synopsis
Tonto Culvert Order .... Read More
Office Location Agency Name Solicitation Base Posting Type
FOREST SERVICE Combined Synopsis/Solicitation
SetAside Type
No Set aside used
Solicitation ID Solicitation Title Solicitation Office
12444126Q0060 Tonto Culvert Order
Synopsis

This project covers the replacement and replenishment of corrugated metal culvert pipes required to support road maintenance operations across the Tonto National Forest. The Contractor shall manufacture, supply, and deliver corrugated metal pipes (CMP) and all associated hardware, including coupling bands, in full compliance with FP-24 specifications (and FP-14 where applicable). All materials must meet requirements for dimensions, coatings, joints, and markings. Deliveries will be intended for stock-on-hand, allowing the Forest Service to rapidly deploy these materials for installation or replacement of drainage infrastructure on Forest System roads. This capability is critical for maintaining roadway drainage capacity and resilience, particularly .... Read More

Office Location Agency Name Solicitation Base Posting Type
FOREST SERVICE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙