SWC 2nd Priority Design-Build MATOC - Pre-solicitation Notice

Posted Date: Sep 17, 2025
Oct 30, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
W912EK25RA015 SWC 2nd Priority Design-Build MATOC - Pre-solicitation Notice
Synopsis

The US Army Corps of Engineers (USACE) - Rock Island District intends to issue a two-phased solicitation for establishing  a design-build construction Indefinite-Quantity Multiple-Award Task Order Contract (IDIQ MATOC) with a total shared capacity not to exceed $99M (million) to provide the design and construction of floodproofing for up to 371 individual structures as part of the Southwest Coastal Louisiana Nonstructural Storm Risk Management Project (SWCLA). Please note that the acquisition strategy has not changed since the related notice was issued.

This source selection will be carried out in accordance with FAR 36.301“Use of two-phase design-build selection procedures”, which .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙