| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 1333ND26RNB190032 | Steam Tunnel Ventilation Replacement | |
| Synopsis | ||
|
SEE ATTACHMENTS FOR FULL PROJECT DETAILS Project: Construction Services/Steam Tunnel Ventilation System Replacement, NIST, Boulder, CO The NAICS for this acquisition is 236220; the Small Business Size Standard is $45.0 Million. The purpose of this project is to replace the existing tunnel ventilation system with steam heating coils with (2) natural gas indirect fired make up air units (MAU’s). This construction effort will procure and deliver a complete, operational tunnel ventilation system, including removal of existing equipment, installation MAU’s, and all associated systems required for safe, reliable, and continuous ventilation system. Work will be planned and phased to be performed between the months of May 1 through October 31, mitigating the chances for pipes to freeze. .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY | Combined Synopsis/Solicitation | |