Steam Tunnel Ventilation Replacement

Posted Date: Jun 17, 2026
Aug 05, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
1333ND26RNB190032 Steam Tunnel Ventilation Replacement
Synopsis

SEE ATTACHMENTS FOR FULL PROJECT DETAILS

Project: Construction Services/Steam Tunnel Ventilation System Replacement, NIST, Boulder, CO

This acquisition is a 100% Small Business Set-Aside.

The NAICS for this acquisition is 236220; the Small Business Size Standard is $45.0 Million.

The purpose of this project is to replace the existing tunnel ventilation system with steam heating coils with (2) natural gas indirect fired make up air units (MAU’s).

This construction effort will procure and deliver a complete, operational tunnel ventilation system, including removal of existing equipment, installation MAU’s, and all associated systems required for safe, reliable, and continuous ventilation system. Work will be planned and phased to be performed between the months of May 1 through October 31, mitigating the chances for pipes to freeze.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙