| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 37050PR26EXTERNALDOORS | STATION ATLANTIC CITY EXTERNAL DOOR REPLACEMENT | |
| Synopsis | ||
|
Provide all labor, materials, equipment, and supervision necessary to remove and replace all ten (10) existing exterior doors and frames on the UPH and Main Buildings at USCG Station Atlantic City. Details contained within the Scope of Work labeled "SOW STA Atlantic City door replacement". .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| US COAST GUARD | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 37050PR26EXTERNALDOORS | STATION ATLANTIC CITY EXTERNAL DOOR REPLACEMENT | |
| Synopsis | ||
|
Provide all labor, materials, equipment, and supervision necessary to remove and replace all ten (10) existing exterior doors and frames on the UPH and Main Buildings at USCG Station Atlantic City. Details contained within the Scope of Work labeled "SOW STA Atlantic City door replacement". .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| US COAST GUARD | Combined Synopsis/Solicitation | |