| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 127EAX26Q0006 | Smoky Circle Fire Center HVAC Replacement | |
| Synopsis | ||
|
The Contractor shall furnish all supervision, materials, equipment, vehicles, tools, parts, labor, transportation, and miscellaneous items needed to remove, dispose, and replace the existing HVAC units and associated ducting work. The contractor shall reinstall any damaged HVAC ducting, Ceiling drywall, texture, moisture barrier and insulation that may be required. All work shall be in accordance with the plans and specifications contained herein. No changes to the specifications, terms, or conditions shall be made without the prior approval of the Contracting Officer in writing. All submittals for changes or substitutions will be subject to a maximum review time of 10 business days and notice of acceptance or rejection will be sent to the contractor by the CO or COR. The contractor is responsible for complying with all applicable regulations and obtaining all permits for this work. .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| FOREST SERVICE | Combined Synopsis/Solicitation | |