| SetAside Type | ||
| No Set aside used | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| FA750125Q0048 | Shredder Power Installation | |
| Synopsis | ||
|
Upgrade power capacity to accommodate the installation of a shredder. Install two electrical circuits: a 480 volt, three-phase, 30-amp; and a 120 volt, single-phase, 30-amp. |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE AIR FORCE | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| No Set aside used | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| FA750125Q0048 | Shredder Power Installation | |
| Synopsis | ||
|
Upgrade power capacity to accommodate the installation of a shredder. Install two electrical circuits: a 480 volt, three-phase, 30-amp; and a 120 volt, single-phase, 30-amp. |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE AIR FORCE | Combined Synopsis/Solicitation | |