SANDING BOOTH SYSTEM

Posted Date: Aug 18, 2025
Aug 22, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
W911S225U1611 SANDING BOOTH SYSTEM
Synopsis
Implemented Amendment to include Set Aside Code from N/A to Total Small Business Set-Aside. Purchase Description for a Sanding BoothScopeThe following document provides the requirements and specifications for the sanding booth.Applicable Documents1. Standards and Regulations:a. NFPA 33b. OSHA CFR-29.1910.1072. Additional DocumentsRequirements3. General RequirementsThis section provides the design specification requirements for the sanding booth.a. Two stage filtration to capture sanding booth dustb. Must accommodate a monorail fed down the middle of the working area4. Specific RequirementsThis section provides specific requirements for the sanding booth equipment requested.a. Inside working dimensionsi. 7 ft. W x 9 ft. 6 in. H x 36 in. .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙