| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W50S7L-25-Q-A005 | RPR Signage Building 25 - JKSE252403 | |
| Synopsis | ||
|
9/20/2025 - Question and Answers The purpose of this posting is to upload all questions received to date below: Q1. Can scaffolding be used to access the sign letters? A1. Yes, as long as plywood or some other rigid protective layer covers the Building TPO roof membrane. Q2. How can I get on the building roof? A2. Contractor’s must access the roof from outside the building via ladders. Q3. Can the road be blocked if a Manlift is used? A3. The road can’t be fully blocked, a .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W50S7L-25-Q-A005 | RPR Signage Building 25 - JKSE252403 | |
| Synopsis | ||
|
JKSE252403 Building 25 - Repaint (1) MONTANA AIR NATIONAL GUARD Lettering The existing letters are 3' - 6" in height. Provide all incidentals to sand/prepare/prime the existing lettering and repaint with exterior high-quality paint approved lettering to Building 25 IAW the Statement of Work dated 9 September 2025. The Contractor quote shall be submitted with quantities, unit prices, mobilization and costs included. The Contractor shall dispose of all excess paint, drop cloths, and other items at their cost. The contractor shall provide all supplies, parts, equipment, tools, labor, personnel, transportation, supervision, and management necessary to Prepare & Paint the existing .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |