RPR Signage Building 25 - JKSE252403

Posted Date: Sep 21, 2025
Sep 23, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
W50S7L-25-Q-A005 RPR Signage Building 25 - JKSE252403
Synopsis

9/20/2025 - Question and Answers

The purpose of this posting is to upload all questions received to date below:

Q1. Can scaffolding be used to access the sign letters?

A1.  Yes, as long as plywood or some other rigid protective layer covers the Building TPO roof membrane.

Q2.  How can I get on the building roof?

A2.  Contractor’s must access the roof from outside the building via ladders.

Q3.  Can the road be blocked if a Manlift is used?

A3.  The road can’t be fully blocked, a .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
W50S7L-25-Q-A005 RPR Signage Building 25 - JKSE252403
Synopsis

JKSE252403 Building 25 - Repaint (1) MONTANA AIR NATIONAL GUARD Lettering The existing letters are 3' - 6" in height. Provide all incidentals to sand/prepare/prime the existing lettering and repaint with exterior high-quality paint approved lettering to Building 25 IAW the Statement of Work dated 9 September 2025.

The Contractor quote shall be submitted with quantities, unit prices, mobilization and costs included.  The Contractor shall dispose of all excess paint, drop cloths, and other items at their cost. The contractor shall provide all supplies, parts, equipment, tools, labor, personnel, transportation, supervision, and management necessary to Prepare & Paint the existing .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙