Rollout Purge Units (RPU)

Posted Date: Nov 22, 2023
Due Date: Jan 04, 2024
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
80KSC024R0004 Rollout Purge Units (RPU)
Synopsis

NASA intends to procure Rollout Purge Units (RPU) to meet Space Launch System (SLS) Block 1B system requirements on Mobile Launcher 2 (ML2) and will be compatible for use on ML1. Two (2) RPUs will be used (one primary unit & 1 stand-by unit) on the ML during rollout from the VAB to the launch pad and rollback to the VAB to provide conditioned air to the Service Module (SM) and Launch Abort System (LAS) on the Space Launch System (SLS). The RPUs will sit on the ML deck and interface with NASA-provided air ducting, electrical power supply and network communications After ML arrival at the Launch Pad the RPUs will be removed from the ML Deck for launch operations.

The contractor shall provide all resources and materials necessary to provide, test, and deliver two (2) RPUs and Associated Air Bearing Pallets (ABP) (3rd units optional) and other deliverables listed in the Statement of Work (SOW).

.... Read More
Office Location Agency Name Solicitation Base Posting Type
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
80KSC024R0004 Rollout Purge Units (RPU)
Synopsis

NASA intends to procure Rollout Purge Units (RPU) to meet Space Launch System (SLS) Block 1B system requirements on Mobile Launcher 2 (ML2) and will be compatible for use on ML1. Two (2) RPUs will be used (one primary unit & 1 stand-by unit) on the ML during rollout from the VAB to the launch pad and rollback to the VAB to provide conditioned air to the Service Module (SM) and Launch Abort System (LAS) on the Space Launch System (SLS). The RPUs will sit on the ML deck and interface with NASA-provided air ducting, electrical power supply and network communications After ML arrival at the Launch Pad the RPUs will be removed from the ML Deck for launch operations.

The contractor shall provide all resources and materials necessary to provide, test, and deliver two (2) RPUs and Associated Air Bearing Pallets (ABP) (3rd units optional) and other deliverables listed in the Statement of Work (SOW).

.... Read More
Office Location Agency Name Solicitation Base Posting Type
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙