Rivers Project Office Boundary Maintenance

Posted Date: Apr 16, 2025
May 06, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
W912P925QA008 Rivers Project Office Boundary Maintenance
Synopsis
This project involves the maintenance of USACE boundary line along Mississippi River Pools 24 and 26, Lower Mississippi Pool 27 (between Mississippi River Miles 181 and 298), and along the Lower Illinois River (between Illinois River Miles 7 and 15)(Figure 1). Total distance is approximately 50.05 miles. The project will also authorize the replacement of missing and damaged monuments by a certified surveyor up to 108 surveyor hours. .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙