Reroute Power Supple at the Phoenix Rearing Facility

Posted Date: Jul 22, 2026
Aug 14, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
12639526Q0224 Reroute Power Supple at the Phoenix Rearing Facility
Synopsis

Reroute Power Supply


POC: Erick Plamann, Contract Specialist, erick.plamann@usda.gov


a licensed electrician remove the 2 conduit tripping hazard and reroute the supply power and control wires overhead to the mixing blender. The breaker panel for the 240-volt 3 phase supply power is located in the next room where the electrician will
have to run new conduit through a wall to the mixing blender. The control wire panel is located within 10 feet from the mixing blender. We prefer that the electrician uses rigid conduit and seals all connections to prevent electrical arching. We do
have fine .... Read More

Office Location Agency Name Solicitation Base Posting Type
ANIMAL AND PLANT HEALTH INSPECTION SERVICE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙