Request for Proposal - UIP-KRS-358654-JK

Posted Date: Aug 16, 2024
Due Date: Sep 10, 2024
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
UIP-KRS-358654-JK Request for Proposal - UIP-KRS-358654-JK
Synopsis
Request for Proposal - UIP-KRS-358654-JK .... Read More
Office Location Agency Name Solicitation Base Posting Type
ENERGY, DEPARTMENT OF Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
UIP-KRS-358654-JK Request for Proposal - UIP-KRS-358654-JK
Synopsis
Request for Proposal - UIP-KRS-358654-JK .... Read More
Office Location Agency Name Solicitation Base Posting Type
ENERGY, DEPARTMENT OF Combined Synopsis/Solicitation
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
UIP-KRS-358654-JK Request for Proposal - UIP-KRS-358654-JK
Synopsis

Provide all labor, materials, tools, equipment, and supervision required to provide a one main power transformer (MPT) Main Power Transformer (MPT) – including auxiliary equipment, services, controls, and the required protective devices necessary for safe and efficient operation of the transformer and accessories (Line Item 001) as delineated in the attached specification and drawings. This request for proposal also includes an option to purchase Bushing Monitoring (Line Item 002). The selected Subcontractor shall deliver the quantities specified and in compliance with all requirements in the specification and drawings documents. All equipment will be provided in accordance with the required quality .... Read More

Office Location Agency Name Solicitation Base Posting Type
ENERGY, DEPARTMENT OF Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙