Repurpose Fountain Main Entrance

Posted Date: May 22, 2025
Jun 04, 2025
Awarded Date: No Awarded Date
SetAside Type
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-A
Solicitation ID Solicitation Title Solicitation Office
36C24625B0022_2 Repurpose Fountain Main Entrance
Synopsis

Amendment 1 to provide responses to RFIs and site visit sign in.

Repurpose the fountain at the Building no. 1 historical entrance by turning it into a planter. Remove current plumbing, top-interior layer of tile veneer, bump-out for plumbing located in the northeast corner of the fountain (see Photo no. 4), water and debris inside the fountain, and electrical back to the source. Relabel the circuit breaker to be a spare. Once all piping, plumbing, and ancillary items are removed; drill holes at the bottom of the basin. Place planting soil inside the basin to a later determined height. Remove and replace the tile on the top of the fountain with a natural earth-tone stone tile. Soft wash the outside siding of the fountain when finished.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
VETERANS AFFAIRS, DEPARTMENT OF Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙