Replace Photo Period Building

Posted Date: Dec 28, 2023
Due Date: Jan 17, 2024
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
12405B23R0016 Replace Photo Period Building
Synopsis
Replace Photo Period Building .... Read More
Office Location Agency Name Solicitation Base Posting Type
AGRICULTURAL RESEARCH SERVICE Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
12405B23R0016 Replace Photo Period Building
Synopsis

AMENDMENT 0002 ISSUED TO PROVIDE ANSWERS TO QUESTIONS 36, 40, and 50 SUBMITTED BY INTERESTED CONTRACTORS IN WHICH ANSWERS WERE NOT PROVIDED ON AMENDMENT 0001.

Q36.  For drying shed foundation, what strength (psi) concrete is preferred?

A36.  4000 psi.

Q40.  It is assumed the existing foundation will handle reaction loads for new PEMB. Please confirm.

A40.  Contractor should not assume that and, if found to be necessary, should submit a design that is signed off on by a Registered PE that meets all Florida and local codes with appropriate reinforcing of the slab as necessary to .... Read More

Office Location Agency Name Solicitation Base Posting Type
AGRICULTURAL RESEARCH SERVICE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙