| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| N4008525R0067 | REPLACE PAD MOUNTED TRANSFORMER, BUILDING 530, NAS OCEANA, VA BEACH, VA | |
| Synopsis | ||
|
The project site is located at NAS Oceana, Building 536. Generally, the work involves demolishing the existing pad mounted transformer TPD-536, the existing concrete equipment pad, and the existing turtle shell and installing a new transformer with a secondary cabinet with a panel board and a new concrete equipment pad. The contractor must provide a temporary generator, including fuel and all materials, to temporarily power Building 536 during transformer replacement. ONLY CONTRACTORS ON THIS MACC GROUP CAN SUBMIT A PROPOSAL. .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| N4008525R0067 | REPLACE PAD MOUNTED TRANSFORMER, BUILDING 530, NAS OCEANA, VA BEACH, VA | |
| Synopsis | ||
|
The project site is located at NAS Oceana, Building 536. Generally, the work involves demolishing the existing pad mounted transformer TPD-536, the existing concrete equipment pad, and the existing turtle shell and installing a new transformer with a secondary cabinet with a panel board and a new concrete equipment pad. The contractor must provide a temporary generator, including fuel and all materials, to temporarily power Building 536 during transformer replacement. ONLY CONTRACTORS ON THIS MACC GROUP CAN SUBMIT A PROPOSAL. .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation | |