| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| N4008526R0109 | Replace Chiller York 2075 | |
| Synopsis | ||
|
The purpose of Amendment 0004 is to Provide Updated Wage Determination WD_VA20260169_5.18.26 and extend proposal due date from 20 MAY 2026 to 27 MAY 2026 at 1400 .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| N4008526R0109 | Replace Chiller York 2075 | |
| Synopsis | ||
|
The contractor shall provide supervision, labor, material and equipment required to perform all work for the following project: Replace Chiller York 2075. The work includes the decommissioning of the existing 100-ton chiller, its relocation to a new site approximately two (2) miles away near the chiller unit at York 1595, and the complete supply, installation, and commissioning of a new high-efficiency 100-ton air-cooled scroll packaged chiller at the original location. Replace all insulation, heat tape, aluminum jacketing, pressure and temperature gauges on water lines above existing concrete pad. The contractor is responsible for providing all labor, materials, tools, equipment, and supervision required to execute this project safely and in compliance with all applicable codes and standards. .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation | |