SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
FA527025R0038 | REPAIR WAKABA CDC | |
Synopsis | ||
This project shall accomplish a design-build repair of:? Work for the addition shall be completed in Phase I, B131, includes recoat roof with elastomericroofing, replace rusted exterior door fixtures and frames, replace ceiling tiles, replace all float glasswith tempered glass, repaint wall and countertop, install FRP wainscot, replace corroded flushvalves and faucets, clean HVAC ductworks, replace diffuser, and replace rusted light fixtures.Work area has been tested for Asbestos-Containing Materials (ACM)/Lead-Based Paint (LBP) andonly found asbestos in the wall mortar, so no ACM/LBP abatement is needed but workers shallwear appropriate protective equipment if work involves disturbing the mortar.? Repair the Wakaba .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE AIR FORCE | Combined Synopsis/Solicitation |
SetAside Type | ||
No Set aside used | ||
Solicitation ID | Solicitation Title | Solicitation Office |
FA527025R0038 | REPAIR WAKABA CDC | |
Synopsis | ||
This project shall accomplish a design-build repair of: |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE AIR FORCE | Presolicitation |