SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
FA527025R0021 | Repair Cracks and Spalling B46806 | |
Synopsis | ||
Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to stabilize structural columns with jacketing procedure and fill gaps between concrete and wall interfaces. Replace all the plumbing items under the slab, fire suppression system, fire alarm system and jammed doors. Install ceiling tiles and suspension system as determined by the construction planning stage. Apply Fiber Reinforced Polymer (FRP) to canopy beams. Replace electrical and other fixtures to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose of Asbestos Containing Material (ACM) and .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE AIR FORCE | Combined Synopsis/Solicitation |
SetAside Type | ||
Local Area Set-Aside (FAR 26.2) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
FA527025R0021 | Repair Cracks and Spalling B46806 | |
Synopsis | ||
Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to restore integrity of steel members that deteriorated due to corrosion. Apply Fiber Reinforced Polymer (FRP) to canopy beams. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). All the work shall comply with Kadena Design Guide and Host Nation standards. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE AIR FORCE | Presolicitation |