Repair Condensate Pipe Pier XRS

Posted Date: Aug 20, 2026
Sep 04, 2026
Awarded Date: No Awarded Date
SetAside Type
Small Business Set Aside - Total
Solicitation ID Solicitation Title Solicitation Office
DKGV1161220 Repair Condensate Pipe Pier XRS
Synopsis

The work to be performed consists of the removal of a non-essential low point drain from a three (3) inch condensate line and the replacement and addition of seismic bracing of the condensate line. Contractor shall furnish all tools, qualified labor, materials, equipment, supplies, and supervision necessary to replace and support repairs to the condensate line. All work shall be accomplished in accordance with all Federal, State, Local Regulations and the guidelines to include but not limited to the following:

1.International Building Code
2.International Mechanical Code
3.International Plumbing Code
4.American Welding Society (AWS)
.... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙