PROVIDE REMOVAL OF 02 EXISTING DOORS AND REPLACE WITH HURRICANE PROOF DOORS AT USCG STA OCEAN CITY

Posted Date: Sep 17, 2025
Sep 23, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
30292RFQ250000020 PROVIDE REMOVAL OF 02 EXISTING DOORS AND REPLACE WITH HURRICANE PROOF DOORS AT USCG STA OCEAN CITY
Synopsis

PROVIDE REMOVAL OF 02 EXISTING DOORS AND REPLACE WITH HURRICANE PROOF DOORS AT USCG STA OCEAN CITY

Please submit a filled-out SF-1442 and technical capabilities (5 pages max).  Review the Scope of work and the FAR clause attachments for the details.

The Contractor shall submit one of the following payment protections:

- A payment bond

- An irrevocable letter of credit (ILC)

The amount of the payment protection shall be 100 percent of the contract price. The submission of the payment protection is required within 5 days of contract award. The payment protection shall provide protection for the full contract performance period plus a one-year period.

There was not an incumbent.

Previous Award number: N/A

.... Read More
Office Location Agency Name Solicitation Base Posting Type
US COAST GUARD Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙