SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W9127824R0110 | Provide Prime Power, Soto Cano Air Base (AB), Honduras | |
Synopsis | ||
Please see Amend 0009. The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a Firm Fixed Price (FFP) contract will be awarded for a .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W9127824R0110 | Provide Prime Power, Soto Cano Air Base (AB), Honduras | |
Synopsis | ||
Amend 0008 is to update provisions and clauses in accordance with recently issued Executive Orders only. The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W9127824R0110 | Provide Prime Power, Soto Cano Air Base (AB), Honduras | |
Synopsis | ||
Amend 0004 extends the proposal due date. The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a Firm Fixed Price (FFP) contract will be awarded .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W9127824R0110 | Provide Prime Power, Soto Cano Air Base (AB), Honduras | |
Synopsis | ||
Amendment 1000 is to post the Pre-proposal Conference Attendance Sheet only. The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a Firm Fixed Price (FFP) .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W9127824R0110 | Provide Prime Power, Soto Cano Air Base (AB), Honduras | |
Synopsis | ||
This amendment is to update the contact information for the preproposals site visit POC to to Mr. Cesar Sabillon at +504 2234-4636 ext. 6845079 or (251) 694-3734 and extend the registration time until 10:00 a.m. Central Standard Time on 2 December 2024 The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W9127824R0110 | Provide Prime Power, Soto Cano Air Base (AB), Honduras | |
Synopsis | ||
The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a Firm Fixed Price (FFP) contract will be awarded for a total of five (5) years, .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W9127824R0110 | Provide Prime Power, Soto Cano Air Base (AB), Honduras | |
Synopsis | ||
The solicitation package will be available for download on or about 22 November 2024. The Contractor shall furnish, install, and operate utility-grade, electric power generation modules, fuel excluded. The modules shall be capable of supplying the entire base peak demand of 6500 kilo-volt-amperes (kVA) at .8 power factor (pf) continuously. The power generation modules shall be housed in ISO-listed, modified shipping containers. The units shall be completely self-contained (with the exception of the external fuel supply) and shall be supplied with all the necessary electrical controls and switchgear so as to operate in parallel. It is anticipated that a .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Presolicitation |