| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W912BV26QA037 | Pressure Valve and Boiler Inspections | |
| Synopsis | ||
|
The Contractor will inspect and test the pressure vessels and boilers at the USACE Newt-Graham Lock and Dam and the Robert S. Kerr Marine Terminal locations as required per statute and/or code. Inspections will be performed in accordance with ASME, NBIC and/or local standards, applicable codes, ordinances, statutes and/or regulations. After inspection, a report will be submitted to include references to applicable violations and list the general condition of the items related to public safety, and USACE (US Army Corps of Engineers) employees. The report will also include current date inspected. Items related to operations, maintenance or performance will not be provided. The necessary preparation of the equipment to be inspected shall be at the sole expense and responsibility of the US Army Corps of Engineers. The Contractor shall be with a government employee at all prepared sites for inspection. .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W912BV26QA037 | Pressure Valve and Boiler Inspections | |
| Synopsis | ||
|
The Contractor will inspect and test the pressure vessels and boilers at the USACE Newt-Graham Lock and Dam and the Robert S. Kerr Marine Terminal locations as required per statute and/or code. Inspections will be performed in accordance with ASME, NBIC and/or local standards, applicable codes, ordinances, statutes and/or regulations. After inspection, a report will be submitted to include references to applicable violations and list the general condition of the items related to public safety, and USACE (US Army Corps of Engineers) employees. The report will also include current date inspected. Items related to operations, maintenance or performance will not be provided. The necessary preparation of the equipment to be inspected shall be at the sole expense and responsibility of the US Army Corps of Engineers. The Contractor shall be with a government employee at all prepared sites for inspection. .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |